TECCOUR PROJECTSPreparation of water network master plan & the design of Jabalia Camp Pipe Network & Concrete Water Tanks & boosters
Preparation of water network master plan & the design of Jabalia Camp Pipe Network & Concrete Water Tanks & boosters
Construction Date: 1997
Location: Jabalia
Employer: PECDAR
Work Description: Complete Design Service & Tender Documents for UPVC & Steel Main Water Distribution Networks (50.0 Km Length) with the Related Drinking Water House Connections & Five Boosters for Water Wells, Concrete Water Tanks (5000M3), the Project Electromechanical works.